The scheme involved an extension to create new classroom accommodation along with refurbishment works to the existing school building. The programme included new disabled toilets, an electrical installation, a heating system upgrade, new ceilings, floor coverings and finishes and the installation of a hoist, including structural beams and track.
"We have been very pleased with the performance of LST from the commencement of the project. Outstanding features have been: The friendly and cooperative staff, excellent liaison, outstanding site management in a complex and confined school environment and being sensitive to the needs of students with severe learning difficulties."