Thisproject involved the strip out and refurbishment of the existing Level 3space, including new floor, wall, and ceiling finishes, associated fittings, AVinstallation, new lighting and modifications to the power and datainstallation.
LST transformed a hall for a primary school in North Hampshire, providing much needed extra space.
This project was a design and build refurbishment of Buildings R1 and R3 on Henley’s Rotherfield Campus.