For more information on customer projects please take a look at a variety of our sample case studies below.
This is the first design and build refurbishment we have completed for Arun District Council’s Leisure Centre.
Basingstoke & Deane Borough Council appointed LST to construct a new community centre, which was designed to blend in with the natural landscape.
LST was appointed by Bovis Homes, Bloor Homes, and Linden Homes to Design and Build a new Community Centre and a Sports Pavilion in Boorley Green, Hampshire.
This £1m project saw LST construct a new two-storey 2,475 sq ft office building on a highly constrained site in Chandlers Ford, Hampshire.
The development at University of Portsmouth included a full refurbishment of the Anglesea Building’s Concrete and Petroleum labs.
This school alteration involved building an extension in a central location within the school premises adjacent to the school hall.
This school refurbishment and extension project in Fareham involved conversion of a gymnasium and creation of new classroom accommodation.
Having worked on several refurbishments for University of Southampton, they asked us back to work on their renovation of the Connaught Halls of Residence.
LST Projects has completed the construction of a multi-million commercial scheme in Micheldever, Hampshire on behalf of developer Ruby Ocean Trading.
This project involved the conversion of the site’s firing range, to provide a new IT data centre and the installation of a new stand-by generator.
Freedom Leisure appointed LST to transform de Stafford Sports Centre in Caterham, Surrey.
LST was appointed for the £4.7m refurbishment of an historic boarding house at Eton College in Windsor.
We were selected by two leading housebuilders to construct a new community centre as part of a large residential scheme in Hampshire.
This infant school required an extension to the library along with two new classrooms.
VolkerStevin were assigned as the principal contractor on the Queen Elizabeth Class (QEC) Base Porting Infrastructure Project at Portsmouth Harbour.
An independent girls’ primary school in Woking, Halstead Prep School came to us to deliver a complex project.
This control room refurbishment had to be delivered without any interruption to 24/7 emergency call response services or other activities within the building.
Our work on the Hartley Library refurbishment of Level 3 led us to work on this project which involved the refurbishment of several other levels of the library.
LST were appointed to complete the refurbishment of the Hartley Library, which involved the strip out and refurbishment of the existing Level 3 space.
Working with our established client Freedom Leisure, LST was appointed to help transform Hudson Leisure Centre in Wisbech, Cambridgeshire.
This project at the University of Southampton, started with the demolition of the rotunda building, link bridge and single storey extension.
The construction of a new £4.3m sports hall for a school in Surrey has been completed by LST Projects.
We first began working with LVS Ascot several years ago and have built up a strong relationship with the school and the expectations they have.
LST was selected by MRC Harwell to deliver a world-class training centre at the Harwell Science and Innovation Campus in Oxfordshire.
This complex lab refurbishment project included office areas, storage space, glass washing and meeting areas.
This refurbishment project involved remodelling of a logistics area.
This lab refurbishment scheme involved remodelling an existing lab to accommodate a new Mass Spectrometer.
This project required specialist skills to remove and isolate the old fume cupboard and manage potential exposure to the contamination present.
LST was appointed by new client, Winchester City Council, to help create a new and more accessible location for Citizens Advice.
Northern Parade Schools are starting an exciting new expansion plan to transform them into a state of the art place of learning.
This external refurbishment of an independent technology store involved alterations to the front elevation, including structural steelwork and curtain-walling.
As one of the country’s leading production theatre companies, Nuffield was awarded Regional Theatre of the Year at The Stage Awards back in 2015.
Following the successful CIF bid and allocation of Government funding, Oaklands Catholic School in Hampshire appointed LST to refurbish N block.
Parsonage Farm School involved both construction of a new building at the front of the campus and some internal alterations within the existing school building.
This challenging operational refurbishment involved delivery of a transformation scheme for the ground floor of Portsmouth City Council’s Civic Offices.
This scheme involved the operational refurbishment of an office building occupied by Portsmouth Hospitals NHS Trust.
Working within the Ageas Bowl Sports Complex for Eastleigh Borough Council, we extended the existing facilities for this thriving local sports club.
Priestlands school is a highly successful secondary school with very good examnation results and is a great place to learn and a great place to work.
LST transformed a hall for a primary school in North Hampshire, providing much needed extra space.
The QE2 Recreation Ground has 3 full size pitches and one junior pitch, 2 basketball pitches and an under-12 play area.
LST was appointed to design and build two extensions to expand the A&E department at Royal Hampshire County Hospital in Winchester.
LST has completed a £1m refurbishment at one of the world’s most spectacular university buildings.
Working to a tight 10-week programme, LST constructed a new surgical simulation suite for the University Hospital Southampton NHS Foundation Trust.
This project involved an operating theatre refurbishment in Salisbury District Hospital’s Obstetrics Department.
The development was a design and build project set to create an extension to the new sixth form block.
This refurbishment scheme involved the conversion of a commercial building into a retail car dealership.
Southampton General Hospital required a full refurbishment of their Major Trauma Ward.
The aim of this project was to create additional in-patient accommodation for Southampton General Hospital’s PICU (Paediatric Intensive Care Unit).
The University Hospital Southampton, saw LST construct a new extension to the hospital’s north wing in a live 24/7 environment.
Appointed by the University Hospital Southampton NHS Foundation Trust (UHS), LST transformed a vacant space into a new urology day unit.
We carried out a healthcare refurbishment scheme at this community mental healthcare facility for Southern Health NHS Foundation Trust.
The scheme involved an extension to create new classroom accommodation along with refurbishment works to the existing school building.
This project involved the demolition and re-construction of second floor science labs and ancillary areas located above the existing school gym.
Delivered over a nine month period this project was completed all within the confines of a live, working school.
Building on an existing relationship with Freedom Leisure, LST was appointed to refurbish Tandridge Leisure Centre in Surrey.
Following on from a successful refurbishment several years ago, we were asked back to complete the refurbishment on 6 science labs and prep rooms at the school.
LST was appointed to remodel and refurbish two buildings (B1 and B16) at the University of Southampton.
Appointed by the University of Southampton, LST Projects was responsible for refurbishing the roof of the University’s main library.
The science park at University of Southampton had a complete overhaul of the IT building on their Venture Road site.
New high-quality staff kitchens for international company Wiley’s UK offices.
As one of the UK’s leading art and design institutions Winchester are continually looking at how to improve and update their facilities.
TKL Architects were appointed by Yellow Dot Nursery to take a new build nursery from planning through to completion as part of a larger housing development.